서브메뉴
검색
A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints
A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints
Detailed Information
- Material Type
- 기사
- ISSN
- 12260797
- Author
- Hyong-Bae Jeon
- Title/Author
- A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints / 저. Hyong-Bae Jeon ; 공저. Jun-Gyu Kim ; Dong-Ho Lee
- Publish Info
- 서울 : 한국경영과학회, 2006.
- Material Info
- pp. 95-112
- Index Term-Uncontrolled
- TWOSTAGE HEURISTIC DISASSEMBLY SCHEDULING CAPACITY CONSTRAINTS
- Added Entry-Personal Name
- Jun-Gyu Kim
- Added Entry-Personal Name
- Dong-Ho Lee
- 모체레코드
- 모체정보확인
- Control Number
- kjul:60085391
MARC
008061211s2006 ULKa a ENG■022 ▼a12260797
■1001 ▼aHyong-Bae Jeon
■245 ▼aA Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints▼d저. Hyong-Bae Jeon▼e공저. Jun-Gyu Kim▼eDong-Ho Lee
■260 ▼a서울▼b한국경영과학회▼c2006.
■300 ▼app. 95-112
■653 ▼aTWOSTAGE▼aHEURISTIC▼aDISASSEMBLY▼aSCHEDULING▼aCAPACITY▼aCONSTRAINTS
■7001 ▼aJun-Gyu Kim
■7001 ▼aDong-Ho Lee
■773 ▼tInternational Journal of Management Science▼gVol.12 No.1 (2006 May)▼d2006, 05
■URL ▼ahttp://www.korms.or.kr
■SIS ▼aS027100▼b60068081▼h8▼s2
Preview
Export
ChatGPT Discussion
AI Recommended Related Books
Detail Info.
- Reservation
- Not Exist
- My Folder
- Reference Materials for Thesis Writing
- Reference Materials for Research Ethics
- Job-Related Books


